Dzhubga TES

MPS Engineering

"Construction of the Olympic object Dzhubga Thermal Power Plant". This is a thermal power plant with a project capacity of 180 MW, designed to ensure stable power supply to the Southern Federal District during peak loads during the Sochi-2014 Olympic Games. During the construction, the reconstruction of the crossing over the main gas pipeline "Blue Stream" Russia-Turkey was also completed. As part of this project, a cascade of hydraulic structures was also built and put into operation: purified water storage pools No. 1 and No. 2, wastewater treatment facilities, and so on. At the end of 2013, the facility joined the unified power system of Russia.